launched fromIndia
IRNSS-1H
Failure
AUG 31201713:30:00 UTCPayload fairing failed to separate, leaving the satellite adrift within the fairing after internally separating from the fourth stage of the rocket. The stage, along with IRNSS-1H, re-entered the atmosphere together on 2 March 2019.
LIFTOFF
AUG 31 201713:30:00 UTC
Failure
launched fromFLPSatish
aboardPSLV XLC39intoGSO
Payload
IRNSS - 1H
Navigation
