CAPSTONE lunar orbiter
Success
JUN 28202209:55:52 UTCFirst NASA CubeSat mission to reach lunar orbit and a pathfinder for the Lunar Gateway, testing the near-rectilinear halo orbit (NRHO) planned for the station. After launch, Rocket Lab's Lunar Photon upper stage performed six orbit-raising burns over six days before releasing CAPSTONE on a ballistic lunar transfer trajectory on July 4, 2022. The launch was originally planned from the Mid-Atlantic Regional Spaceport, but was moved to Mahia due to AFTS certification delays.
LIFTOFF
JUN 28 202209:55:52 UTC
Success
launched fromLC-1BMahia
aboardElectronintoLunar
Payloads · 2
- 01
CAPSTONE
Space tug
- 02
Photon
Space tug / Lunar flyby
