launched fromUSA
Mk.6 REV
Failure
FEB 16196321:45:00 UTCDesign flaw caused the silo umbilicals to rip wiring out of the missile at liftoff, cutting power to the guidance system and causing complete loss of control. The malfunction prevented the range safety destruct charges from working, but the backup destruct system activated at T+30 seconds. "Awful Tired"
LIFTOFF
FEB 16 196321:45:00 UTC
Failure
launched fromLC-395-CVandenberg
aboardTitan IIN-7intoSuborbital
Payload
